4 May 2024
Steelhead LNG signs pre-FEED contract for Malahat terminal
Publication date: 24 September 2015
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Vancouver-based Steelhead LNG has signed a pre-front-end engineering and design (pre-FEED) contract with shipper Hoegh and engineering company Bechtel for the construction of the 6 mtpa Malahat LNG terminal in Canada.