30 April 2024
Shell to build, operate and supply LNG terminal to Gibraltar
Publication date: 22 August 2016
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Gibraltar has contracted Royal Dutch Shell to build an LNG regasification plant and supply gas to the terminal and a 80 MW dual-fuel power station currently under construction, the Gilbraltarian government said in a statement.
The LNG volumes and capacity of the regas plant were not disclosed, but the LNG import facility will be operated by Shell’s subsidiary Gasnor.