3 May 2024
Colombian FSRU ends eight-month dry spell with second LNG delivery
Publication date: 01 August 2017
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Colombia’s floating storage regasification unit (FSRU) received its second ever LNG shipment last week, eight months after the terminal’s inaugural cargo in November 2016.
The 80,000-cm payload, delivered to the 170,000-cm Hoegh Grace on 26 July, marks the end of a dry spell for Calamari LNG, the Colombian consortium created to buy LNG for a group of power generators known as Grupo Termico.
With waning indigenous production and domestic demand forecast to ...