28 April 2024
Japan poised to double nuclear output as KEPCO clear to restart Ohi reactors
Publication date: 28 November 2017
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Japanese utility Kansai Electric Power (KEPCO) is preparing to restart two reactors totalling 2.36 GW at its Ohi nuclear power plant in Fukui prefecture early next year after receiving the go-ahead from the local authority.
The Fukui prefecture government said this week that Ohi units 3 and 4 could fire up after passing a series of post-Fukushima safety inspections ...