6 May 2024
“Piping failure” to leave Angola LNG out for much of Q2 – Chevron CFO
Publication date: 09 May 2014
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
A technical problem in mid-April [1] at Angola LNG was caused by a pipeline failure in the vent system, project leader Chevron said this week during a Q1 earnings conference call, with the $10 billion project expected to remain offline for much of Q2.