29 March 2024
Central Asian gas pipeline transported 2 Bcm of gas to China as of July 15
Publication date: 16 July 2010
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
China National Petroleum Corp (CNPC) has said that over visual_editor Bcm of Turkmen gas has been transported to China between the start-up of the Central Asian Gas Pipeline (CAGP) on December 14 and July 15. Capacity of the interconnector will be ramped up to 40 Bcm/year of gas by visual_editor01visual_editor/13.