28 March 2024
Dabhol LNG terminal to receive first commissioning cargo in December
Publication date: 03 November 2010
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
The Ratnagiri Gas and Power Private Limited (RGPPL) 5.0 mtpa Dabhol LNG import terminal is scheduled to receive its first cargo in December this year. The commissioning of the terminal located in Masharastra on the west coast of India, was originally slated to open in visual_editor009, but has suffered several delays.