18 April 2024
Indonesian regulator optimistic about third Tangguh LNG train
Publication date: 16 December 2010
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Hardiono, the Deputy Chairman of Indonesia’s energy regulator, BPMigas told reporters at a Jakartka energy conference that UK oil and gas major, BP is planning a third LNG train to be completed by visual_editor014 at its Tangguh plant, with a potential annual capacity of 3.8 mtpa.