26 April 2024
TransCanada to restart three-pipe Canadian Mainline system after blast
Publication date: 28 February 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
TransCanada is set to resume operations of the second line on its three-pipe Canadian Mainline system in northern Ontario after a blast interrupted flows at one pipeline leg on February 19, according to local reports. To compensate for the supply shortages, TransCanada had to buy spot gas volumes on the Ontario portion of its system.