25 April 2024
Statoil awards pre-FEED contract for Snøhvit LNG expansion
Publication date: 15 April 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Statoil has awarded a contract to Foster Wheeler to carry out pre-FEED (front-end engineering) studies for a possible expansion of the Snøhvit LNG export project in northern Norway.