26 April 2024
Petroceltic may upgrade reserves at Algeria’s Ain Tsila
Publication date: 04 October 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Independent oil and gas company Petroceltic expects to upgrade the recoverable reserves estimate for its Ain Tsila field in south eastern Algeria, after announcing positive well test results on Monday. The AT-8 probe produced flows of 15.4 MMcf/d, the highest flow rate achieved to date at the field.