28 March 2024
Cheniere signs $3.9 billion EPC contract for Sabine Pass
Publication date: 17 November 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Cheniere Energy and Bechtel have signed a $3.9 billion engineering, procurement and construction (EPC) contract for Bechtel to develop the first two liquefaction trains at the Sabine Pass LNG terminal in Cameron Parish, Louisiana.