8 May 2024
Milford Haven LNG pipeline work faces delay
Publication date: 25 November 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
The UK’s Milford Haven LNG terminals may not be able to operate at maximum natural gas send-out until autumn visual_editor01visual_editor, according to grid operator, National Grid. The pipeline infrastructure connecting the LNG terminals in South Wales to the NTS was meant to be fully operational by the summer of visual_editor01visual_editor. No specific reason for the delay was given by National Grid.