26 April 2024
Indonesia’s PLN may receive 50% of gas from third Tangguh LNG train
Publication date: 30 November 2011
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Indonesian state-owned utility PT PLN may receive half the gas from the planned third train at the Tangguh LNG plant in Papua, local reports in Indonesia have quoted the government as saying. The third train is projected to have a 3.8 mtpa capacity and is scheduled to be commercially operational by 2018.