26 April 2024
Gas injection starts at new CNPC storage facility
Publication date: 10 July 2014
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Large scale gas injection has started at CNPC’s Xiangguosi underground gas storage facility, with the system expected to provide 10 MMcm/day for winter peak shaving by December.