29 April 2024
Eni fires up Jangkrik gas project ahead of schedule
Publication date: 15 May 2017
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Eni has started up its 1.3 Tcf Jangkrik deepwater gas project located offshore Indonesia a month ahead of schedule, the Italian major said on Monday.
Gas produced from 10 wells across two gas fields in the Kutei basin is connected to a newly installed floating production unit (FPU), also named Jangkrik.