Copyright © 2024 Gas Strategies Group Ltd. All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form
or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher.
If you would like to distribute this content please contact the Editorial team at Gas Strategies.
;
Capacity on the 20 Bcm/year bi–directional Interconnector UK pipeline between the UK and Belgium has been reduced by...